Floor and ceiling runners j shaped runner 2 1 2 in.
2 hr ul listing for raised floor.
Or what fire proofing would be required to supplement the concrete flooor.
Urb concealed grid system and tile.
2079 class ii and iii movement and 1 2 or 3 hour fire test as noted.
Wide with unequal legs of 1 in.
I have looked through the ul catelog but have not found an assembly that includes a one way slab with.
Our range of drawings can help pros plan projects more effectively by utilizing designs for a fire rated ceiling assembly.
A secure online source for increased visibility into your ul project files product information documents samples and services.
12 x 24 2 x 4 8 w10 x 25 beam floor units and beam support 3 hr.
Discover monokote products ul designs thickness and more about floor assemblies.
Meets the requirements of astm e1966 astm e119 and astm e1399.
Deck to deck or floor to floor minimum 6 150mm thick.
And 2 in fabricated from.
Does anyone know of a ul listing of floor slab thicknesses fire ratings.
Achieving a 2 hour floor ceiling assembly from the underside only home articles achieving a 2 hour floor ceiling assembly from the underside only one of our current projects is a change of occupancy where the change will require a 2 hour rating between the main level a 2 occupancy and the r 2 occupancy above.
Here you can find drawings for our ul fire rated floor assemblies and ul fire rated ceiling assemblies.
Certification database ul product iq.
Fire rating 1 hour.
3 4 fr 83 12 x 12 z runners fluorescent type none 2 1 2 concrete.
Concrete with cellular steel 3 hr.
Manufactures intumescent coatings that are ibc nfpa code compliant for astm e119 fire endurance ratings that require 1 or 2 hour fire protection in accordance with ul 263 astm e119 can ulc s101 and iso 834 standards.
Nonbearing wall rating 2 hr.
Indicates such products shall bear the ul or cul certification mark for jurisdictions employing the ul or cul certification such as canada respectively.
Systems listings with 3 m hilti rectorseal and nelsons all require a minimum of 1 inch of mineral wool batt insulation packed tightly into both ends of the sleeve and recessed for the amount of sealant to be used the wool batt acts as a backing for the intumescent sealant that is used to seal both ends of the sleeve.